The capping machine debugging is divided into three steps: the first step is to debug the capping wheel. The adjustment of the three rows of capping wheels in the front and back is different. The second step is to adjust the conveyor chain plate. The width and height of the conveyor chain plate should be consistent with the product height and size. The third step is to adjust the upper cover system. After adjusting the upper cover system, the equipment can be normal
The daily maintenance of the laser granulator can not be separated from the daily maintenance if the service life of the granulator becomes longer. Shanghai Fangxing Packaging Machinery has produced a video for the daily maintenance of the granulator.